“`html
Downtown Charleston Gears Up for Nighttime Paving: Key Streets to See Road Work
Table of Contents
- 1. Downtown Charleston Gears Up for Nighttime Paving: Key Streets to See Road Work
- 2. Navigating Downtown Charleston During Paving Operations
- 3. Affected Streets and Detour Considerations
- 4. What are the specific dates and times of the Meeting Street closure?
- 5. downtown Charleston road Closures Planned for Nighttime Construction
- 6. Understanding the Current Infrastructure Projects
- 7. Specific Road Closure Details (july – November 2025)
- 8. Impact on Popular Charleston Attractions & Businesses
- 9. Detour Routes & Option Transportation
- 10. Benefits of the Infrastructure Improvements
- 11. Real-Time Updates & Resources
- 12. Tips for Visitors to Charleston
Charleston, SC – South Carolina Department of Transportation (SCDOT) is set to commence essential nighttime paving work across several key arteries in downtown Charleston. This vital infrastructure upgrade is scheduled to take place from July 20 through July 26, with operations running between 7 p.m. and 6 a.m. each night.
Motorists traversing the downtown charleston area should anticipate potential disruptions as the paving project unfolds. While traffic flow will be maintained throughout the duration of the work, drivers can expect reduced speed limits and possible delays. SCDOT advises all drivers to exercise caution and remain attentive to work crews and posted signage within these active zones.
Affected Streets and Detour Considerations
The scheduled paving will impact several major downtown routes, necessitating careful planning for local commuters and visitors alike. The specific streets slated for resurfacing include:
- Morris Street, between King Street and Rutledge Avenue
- Ashley Avenue, from Kennedy Street to Moultrie Street
- Race Street, spanning from King Street to Maranda Holmes Street
- Maranda Holmes Street, with work planned between Congress Street and Sumter Street
To mitigate the impact on daily commutes, drivers are strongly encouraged to identify and utilize option routes during the specified work hours. This proactive approach can considerably reduce travel times and stress.
Parking Restrictions During Paving
To facilitate the efficient execution of the paving project, on-street parking will be temporarily suspended on the affected roads during the hours of operation. Strict enforcement of towing regulations will be in effect to ensure work zones remain clear and accessible for crews.
| Street Segment |
|---|