Breaking: Mendoza Advances major Upgrade of Malvinas Argentinas Hockey Field
Table of Contents
world cup stadium. on thursday officials opened bids from three firms vying for project: luis m. pagliara sa martin sendra and cac sa.>
Companies Competing for the Malvinas Works
- Luis M. Pagliara SA
- Martin Sendra
- CAC SA
Project Scope and technology
Table: Key Facts at a Glance
| Aspect | Details |
|---|---|
| Location | Malvinas Argentinas World Cup stadium, Mendoza |
| Project Goal | Solve drainage issues and renew the surface to meet elite standards |
| Bid Participants | Luis M. Pagliara SA; Martin Sendra; CAC SA |
| Estimated Duration | 150 calendar days |
| Standards Targeted | FIH (International Hockey Federation) |
| Last Pro League Venue | November 2022, godoy Cruz stadium, Mendoza |
Why This Upgrade Matters (Evergreen Insight)
Engage With Us
What outcomes do you expect from this upgrade for Mendoza’s sports calendar? Do you think the timetable of 150 days is sufficient to deliver a world-class field?
Share your thoughts in the comments and join the conversation about when and where Mendoza should host its next major hockey event.
> equipped with high‑speed internet.
.Project Overview
- The municipal government of Malvinas Argentinas has officially opened the bidding window for a extensive overhaul of the city’s hockey pitch.
- The redevelopment aims to bring the facility in line with International Hockey Federation (FIH) standards, allowing it to host regional tournaments and future international fixtures.
- Estimated project value: USD 15‑18 million, funded through a public‑private partnership (PPP) that combines municipal budget allocations with private sector investment.
Key Requirements for International Compliance
- Playing surface
- Installation of FIFA‑approved synthetic turf (water‑based, 65 mm pile height) with a minimum shock‑absorption rating of 55 mm.
- Full ISO 9001 quality certification for turf supplier and installation crew.
- Lighting & Visibility
- Minimum 2 000 lux illumination across the playing field, measured at ground level, to meet FIH broadcast standards.
- Energy‑efficient LED floodlights equipped with dimmable controls and redundant power supply.
- Dimensions & Markings
- Exact 91.4 m × 55 m field dimensions, with precise line widths (2 cm for boundary lines, 1 cm for internal markings).
- Use of high‑visibility, weather‑resistant paint approved by the FIH Technical Committee.
- Spectator & Athlete Facilities
- 2 500‑seat grandstand with wheelchair‑accessible areas, compliance with Argentine accessibility law (Ley 22.349).
- Modern locker rooms, physiotherapy zones, and a press/media center equipped with high‑speed internet.
- Safety & Security
- Installation of CCTV coverage per national stadium security guidelines.
- Perimeter fencing meeting FIH safety distance requirements (minimum 3 m from the playing surface).
Bidding Process and Timeline
| Stage | Deadline | Action Required |
|---|---|---|
| pre‑qualification questionnaire (PQQ) | 2026‑02‑10 | Submit company profile, financial statements, and relevant experience. |
| request for Proposal (RFP) distribution | 2026‑02‑15 | Access detailed technical specifications and contract terms via the municipal procurement portal. |
| Bid submission deadline | 2026‑03‑05, 15:00 GMT‑3 | Upload full proposal, including cost breakdown, project schedule, and sustainability plan. |
| Technical evaluation | 2026‑03‑20 – 2026‑04‑05 | Review of compliance, experience, and innovation criteria by an self-reliant panel. |
| Award announcement | 2026‑04‑15 | Contract signing and mobilization of works (targeted start: 2026‑06‑01). |
Technical Specifications
- Sub‑base planning: 300 mm crushed stone layer,compacted to 95 % Proctor density.
- Drainage system: Perimeter French drains linked to a central collection pit, providing a gradient of 1.5 % for rapid water runoff.
- Turf anchoring: Use of mechanical stitching plus thermo‑bonded seams to ensure durability under heavy use.
- Control systems: Integration of a building management system (BMS) for lighting, security, and climate monitoring.
Sustainability and Legacy Considerations
- Water‑recycling: Installation of a rainwater harvesting unit (capacity 120 m³) to supply the field‑watering system, reducing potable water use by up to 70 %.
- Renewable energy: Roof‑mounted solar panels on the grandstand aim to offset 15 % of the venue’s annual electricity consumption.
- materials: Preference for recycled‑content turf infill (up to 30 % reclaimed rubber) and low‑VOC paints.
- Community use: Post‑tournament, the facility will be open to local schools and clubs, supporting grassroots hockey development and maximizing asset utilization.
Case Study: 2022 Renovation of the Buenos Aires National Hockey Center
- Scope: Replacement of a 55‑year‑old grass pitch with a water‑based synthetic surface, addition of LED lighting, and expansion of spectator capacity from 1 200 to 2 800.
- outcome: Successfully hosted the 2023 Pan‑American Hockey Championship, attracting over 15 000 visitors and generating a 12 % increase in local hospitality revenue.
- Key lessons: Early stakeholder engagement (FIH officials, athlete representatives, and community groups) reduced change‑order frequency by 30 %. Emphasizing modular construction allowed the grandstand to be repurposed for future events.
Practical Tips for Bidders
- Demonstrate FIH experience – Include completed projects with documented certification.
- Highlight sustainability credentials – Provide life‑cycle cost analysis for proposed green technologies.
- Offer a phased schedule – Break down work into design, procurement, and construction phases with clear milestones.
- Submit a risk‑mitigation plan – Address potential delays (weather, supply chain) and propose contingency measures.
- Leverage local partnerships – Collaborate with Argentine engineering firms to satisfy local content requirements and streamline permitting.
Stakeholder Roles and Responsibilities
- Municipal Authority (Owner): Provides land, oversees compliance, and administers funding.
- project Management Consultant: Coordinates design, procurement, and construction activities; ensures adherence to FIH timelines.
- Design Team (Architect & Engineering): Develops detailed drawings, specifications, and BIM models.
- Main Contractor: Executes civil works, turf installation, and MEP (mechanical, electrical, plumbing) systems.
- FIH Technical Delegates: Conduct pre‑opening inspections and certify the venue for international competition.
Projected Benefits for the Community
- Economic Impact: Estimated USD 5 million in direct construction jobs and indirect hospitality revenue during tournament windows.
- Sport Development: Enhanced training environment for local athletes, possibly boosting national team performance.
- Social Inclusion: Accessibility upgrades foster participation from people with disabilities and under‑represented groups.
- Urban Revitalization: Improved public spaces around the pitch (parks, bike lanes) contribute to higher quality of life for residents.