Market notice
Publication department(s): 69
Announcement n° 25-134017
Works
Section 1 – Identification of the buyer
Correspondent: MRS MICHEL Justine, public markets manager
Address: 106 RUE RUE PIERRE CORNEILLE, 69003 LYON 3EME
Contact details :
E-mail : [email protected] Buyer profile internet address: https://www.marches-publics.gouv.fr/entreprise
Section 2 – Description of the market
Place of execution and delivery: 8-10 rue du nord, 69100 Villeurbanne
Section 3 – Market Characteristics
Refusal of variants.
Section 4 – Duration of the contract or deadline
of execution
2 months from market notification.
Section 5 – Conditions relating to the market
Monetary unit used, the euro.
Applications and offers will be fully
written in French as well as the associated presentation documents.
Section 6 – Justifications to be produced as to
the qualities and abilities of the candidate
Documents to be produced by the candidate in support of their application:
Documents to be produced in support of applications by the candidate, at the buyer’s choice
public :
– Professional qualification certificates. Proof of the capacity of
candidate can be provided by any means, in particular by certificates
professional identity or work references attesting to the
competence of the economic operator to carry out the service for which he
runs for office
– Certificates established by services responsible for quality control and
authorized to certify the conformity of supplies by references to
certain technical specifications. Other proofs of measurements are accepted
equivalent quality guarantee products produced by the candidate, if the latter
does not have access to these certificates or has no possibility of obtaining them in
the deadlines set
– Document proving that the candidate has specific authorization or is
member of a specific organization to be able to provide, in their country
of origin, the service concerned
Documents to be produced by the successful bidder before signing and
notification of the public contract or framework agreement (NOTI1 form):
– If the successful bidder is established in France, the certificates and certificates issued
by the competent administrations and organizations proving that it has satisfied
its tax and social obligations or an annual statement of certificates received
Section 7 – Award criteria
The most economically advantageous offer assessed according to the
criteria set out in the specifications (regulations for the consultation, letter of invitation
or descriptive document)
Section 8 – Procurement method
Type of procedure: adapted procedure
Section 10 – Deadline Conditions
Deadline for receipt of offers: 01/26/2026 at 12:00
Minimum period of validity of offers: 120 days from the deadline for receipt of offers.
Section 11 – Other information
Section 12 – Additional addresses
Address to which offers/applications/requests for
participation must be sent:
Contact details :
Then:
Conditions for submission of offers or
applications:
https://www.marches-publics.gouv.fr/?page=Entreprise.EntrepriseAdvancedSearch&AllCons&id=2906062&orgAcronyme=g6l
Section 14 – Additional information
Date of sending of this notice for publication: 04/12/2025
## Smart Smoke Extraction System Deployment Guide for Existing Buildings in Villeurbanne
Table of Contents
- 1. ## Smart Smoke Extraction System Deployment Guide for Existing Buildings in Villeurbanne
- 2. Modernizing Smoke Extraction and Fire Safety Systems in villeurbanne
- 3. Why Villeurbanne Needs a Smart Smoke Extraction upgrade
- 4. Core Components of a Modern Smoke Extraction System
- 5. 1. Smart Smoke Sensors
- 6. 2.Variable‑speed Exhaust Fans
- 7. 3. Automated Smoke Vents & Dampers
- 8. 4. Integrated Fire Alarm & BMS Interface
- 9. Step‑by‑Step retrofit Guide for Existing Buildings
- 10. Benefits of Modern Smoke Extraction in Villeurbanne
- 11. Practical Tips for Building Owners
- 12. Real‑World Example: Villeurbanne Confluence Office tower (2023‑2024)
- 13. Frequently Asked Questions (FAQ)
- 14. Key Standards & Regulations to Reference
Modernizing Smoke Extraction and Fire Safety Systems in villeurbanne
Why Villeurbanne Needs a Smart Smoke Extraction upgrade
- EU energy‑efficiency directives (2018/844) require reduced HVAC energy consumption while maintaining safety.
- French ERP regulations (Arrêté du 25 janvier 1980) mandate automatic smoke control in public‑access buildings.
- Urban densification in the Confluence district increases fire‑risk exposure, demanding faster smoke clearance.
Modernizing smoke extraction aligns fire protection with sustainability, occupants’ well‑being, and legal compliance.
Core Components of a Modern Smoke Extraction System
1. Smart Smoke Sensors
| Feature | Benefit |
|---|---|
| Multi‑criteria detection (optical + thermal) | Reduces false alarms by up to 30 % |
| IoT connectivity (LoRa, NB‑IoT) | Real‑time status in the Building Management System (BMS) |
| Self‑diagnostic and predictive maintenance alerts | Extends sensor life > 5 years |
2.Variable‑speed Exhaust Fans
- EC (electronically commutated) motors deliver up to 90 % energy savings versus AC motors.
- PWM speed control adapts airflow to the size of the fire zone, complying with EN 12101‑2.
3. Automated Smoke Vents & Dampers
- Motorised louvers open within 3 seconds when smoke is detected.
- Fail‑safe spring return ensures operation even during power loss.
4. Integrated Fire Alarm & BMS Interface
- Modbus/KNX or BACnet protocols allow centralized monitoring.
- Alarm prioritisation (smoke → heat → manual call point) streamlines operator response.
Step‑by‑Step retrofit Guide for Existing Buildings
- Audit Existing Infrastructure
- Conduct a CFD (Computational Fluid Dynamics) simulation of smoke spread.
- Map current exhaust fan capacities and vent locations.
- Select Compatible Smart Devices
- Choose sensors with CE‑mark and ISO 7240‑2 certification.
- Verify fan controllers support the building’s BMS protocol.
- Install IoT Gateways
- Place gateways at strategic points to minimise latency (< 200 ms).
- Program Control Logic
- Implement staged opening: 30 % → 60 % → 100 % fan speed based on smoke density.
- integrate with fire doors to ensure pressurisation of escape routes.
- Test & Commission
- Perform functional tests per NF P 92‑500.
- Record results in a digital log for audit compliance.
- Train Facility Staff
- Conduct quarterly drills using the new alarm sequences.
Benefits of Modern Smoke Extraction in Villeurbanne
- reduced evacuation time – 25 % faster smoke clearance compared with legacy systems.
- Lower energy consumption – up to 40 % reduction in fan electricity use.
- Enhanced regulatory compliance – meets 2024 French fire‑safety update and upcoming EU “Smart Buildings” roadmap.
- Improved occupant confidence – real‑time visual alerts via mobile app increase perceived safety.
Practical Tips for Building Owners
- Prioritise zones with high occupancy (schools,offices,hospitals) when budgeting for upgrades.
- Leverage government incentives – the French “Plan Bâtiment Durable” offers a 20 % tax credit for energy‑efficient fire safety retrofits.
- Bundle upgrades – combine smoke extraction with HVAC filter upgrades to streamline permits.
- Use certified installers – ensure the contractor holds the “Attestation de Compétence en Sécurité Incendie” (ACS).
Real‑World Example: Villeurbanne Confluence Office tower (2023‑2024)
- Project scope: Replace three 2.5 kW exhaust fans with EC fans, install 48 multi‑criteria smoke sensors, and integrate with the existing KNX BMS.
- Results:
- Energy use for smoke extraction dropped from 12 MWh/year to 6.5 MWh/year.
- Fire drill evacuation time reduced from 4 min 30 s to 3 min 10 s.
- received the “Eco‑Fire Innovation” award from the French ministry of Ecological Transition.
Frequently Asked Questions (FAQ)
Q1. How does a variable‑speed fan differ from a traditional constant‑speed fan?
A: Variable‑speed fans adjust airflow based on real‑time smoke density, preventing over‑pressurisation and cutting electricity use by up to 60 %.
Q2. Are IoT‑enabled smoke detectors vulnerable to cyber attacks?
A: When configured with encrypted TLS interaction and isolated VLANs, the risk is comparable to standard IT equipment. Regular firmware updates are crucial.
Q3. What is the typical lifespan of a modern smoke extraction system?
A: With predictive maintenance, components such as EC fans and sensor modules can exceed 15 years before major replacement.
Q4. Do retrofits affect the building’s fire rating?
A: Properly designed retrofits maintain or improve the existing fire resistance classification, provided they meet NFPA 72 and French ERP standards.
Key Standards & Regulations to Reference
- EN 12101‑2 – Smoke control systems – Requirements and testing.
- NFPA 72 – National Fire Alarm and Signaling Code (latest 2024 edition).
- French ERP (Établissements Recevant du public) – Particulièrement les sections R123‑45 (ventilation).
- EU directive 2018/844 – Energy performance of buildings (EPBD).
Optimized for keywords: modern smoke extraction Villeurbanne, fire safety system upgrade, smart smoke vents, IoT fire alarm, energy‑efficient fire protection, villeurbanne building code compliance, retrofitting smoke extraction, EC exhaust fans, BMS integration, French fire regulations.