34
Ruta
Section Status
Transit
LARGE GATE – CHIHUIDOS – EMP RP 7
EQUIPMENT OPERATING. HEAVY TRAFFIC.
TCP
CHOS MALAL – TRICAO MALAL – HUINGANCO FIELD
SECTORS WITH SAWS. POOLED SECTORS. SECTORS WITH MUD
TCP
EMP. RN 40 – MARIANO MORENO – EMP. RP 16
ROAD WITH DEFORMATIONS.
TCP
EL HUECU – MALLÍN LARGO – NAUNAUCO – EMP. RN 40
T
EMP. RP 7 (WATER POINT) – RINCÓN DE LOS SAUCES
ROAD EQUIPMENT AND PERSONNEL OPERATING IN THE REPAVEMENT WORK. INTERMITTENT CUTS AND DIVERSIONS. SECTORS WITH POTHOLES.
TCP
OCTAVIO PICO – CATRIEL CRUISE
MUD ON ROAD. HEAVY TRAFFIC. acc. A PATA MORA A ACC. OCTAVIO PICO. SECTORS WITH SAWS.
TCP
CATRIEL CRUISE – RINCON DE LOS SAUCES
HEAVY TRAFFIC.
TCP
CORNER OF LOS SAUCES – PUESTO HERNÁNDEZ – EMP. RN 40
POOLED SECTORS AND MUD. EQUIPMENT OPERATING.
TCP
CHOS MALAL – THE CHOLAR
POOLED SECTORS.
TCP
EL CHOLAR – PICHACHEN
NORMAL. CHACAICO – PICHACHEN: INTERNATIONAL PASSING ENABLED
T
NEUQUÉN – CENTENARY – EMP RP 51
HEAVY TRAFFIC.
TCP
LTE C/RÍO NEGRO – EL CRUCE (EMP RP 8)
HEAVY TRAFFIC.
TCP
EMP RP 8 (EL CRUCE) – AÑELO (EMP. RP 17)
CAUTION DUE TO ACCUMULATION OF WATER AND SEDIMENTS IN SECTORS.
TCP
AñELO (EMP. RP 17) – EMP. RP 5
PRESENCE OF EQUIPMENT AND PERSONNEL WORKING ON EMBANKMENT REMEDIATION AND SHOULDER STABILIZATION TASKS
TCP
EMP. RP 5 – LOS RANQUILES – EMP. RN 40
SECTORS WITH MUD ON THE ROAD AND CROSS SECTIONS. POOLED SECTORS. EQUIPMENT OPERATING.
TCP
EMP. RP 51 – EMP. RP 7
HEAVY TRAFFIC.
TCP
EMP. RP 7 (THE CROSSING) – CATRIEL CRUISE
SECTORS WITH SAW. EQUIPMENT OPERATING.
TCP
THE CRUISES – MOQUEHUE (EMP. RP 13)
POOLED SECTORS AND MUD. STRAY ANIMALS. CARRYING CHAINS.
TCP
MOQUEHUE – ÑORQUINCO
POOLED SECTORS AND MUD. CARRYING CHAINS.
TCP
ÑORQUINCO – EMP. RP 23
POOLED SECTORS AND MUD. CARRYING CHAINS.
TCP
ZAPALA – FIRST PINES
SECTORS WITH POTHOLES AND ICE.
TCP
FIRST PINES – LITRÁN
SECTORS WITH ICE. SNOW PACKING.
I
LITRÁN – ANGOSTURA – GENDARMERIE – BATEA MAHUIDA
LOW ADHESION DUE TO ICE. CARRYING CHAINS.
TCP
ANGOSTURA / GENDARMERIE – ICALMA PASS
LOW ADHESION DUE TO ICE. CARRYING CHAINS.
TCP
ICALMA STEP
LOW ADHESION DUE TO ICE. CARRYING CHAINS. STEP ENABLED.
TCP
ZAPALA (EMP. RN 22) – COVUNCO DOWNTOWN
WET ASPHALT TAPE. ROADWAY WITH DEFORMATIONS.
TCP
COVUNCO CENTER – EMP RN 40 (ACC. BAJADA DEL AGRIO)
EQUIPMENT OPERATING, PARTIAL RIPPED.
TCP
THREE STONES – PASS OF THE INDIANS RAFT
POCKED SECTORS.LOOSE GRAVEL
TCP
EMP. RP 8 – YEAR
SECTORS WITH SAWS. HEAVY TRAFFIC. EQUIPMENT OPERATING.
TCP
YEAR – PLAZA HUINCUL
PRECAUTION DUE TO ACCUMULATION OF WATER AND SEDIMENT ON THE ROAD IN SECTORS
TCP
PLAZA HUINCUL – PICÚN LEUFú (EMP. RN 237)
SECTORS WITH POTHOLES.
TCP
EMP. RP 23 – RUCA CHOROI
POOLED SECTORS AND MUD. STRAY ANIMALS. CARRYING CHAINS.
TCP
EMP.RN 40 – CERRO CHAPELCO
SECTORS WITH MUD. EQUIPMENT OPERATING IN CALZADA WIDENING
TCP
PICÚN LEUFú – LIMAY CENTRO – PASO AGUERRE – EMP. RN 40
SECTORS WITH MUD. PRESENCE OF ANIMALS BY TRANSHUMANCE
TCP
EMP. RN 40 (AGUADA DEL OVERO) – SOUTH CHACAICO – EMP. RP 46 (SPINAZO DEL ZORRO)
SECTORS WITH MUD. PRESENCE OF ANIMALS BY TRANSHUMANCE
TCP
EMP. RN 242 – HUARENCHENQUE – LONCOPUé
WET ASPHALT TAPE. PRESENCE OF ANIMALS BY TRANSHUMANCE
TCP
LONCOPUé – EL HUECU
WET ASPHALT TAPE. POOLED SECTORS. EQUIPMENT OPERATING. PRESENCE OF ANIMALS BY TRANSHUMANCE
TCP
EL HUECU – MANDOLEGUE – EL CHOLAR
WET ASPHALT TAPE. POOLED SECTORS. PRESENCE OF ANIMALS BY TRANSHUMANCE
TCP
NEUQUEN – ARROYITO
TCP
ARROYITO – PLAZA HUINCUL – CUTRAL-Có
TCP
CUTRAL-Có – ZAPALA
TCP
JUNÍN DE LOS ANDES – MALLEO
WET ASPHALT TAPE. SECTORS WITH MUD. PRESENCE OF ANIMALS BY TRANSHUMANCE
TCP
MALLEO – PILO LIL
WET ASPHALT TAPE. PRESENCE OF ANIMALS BY TRANSHUMANCE
TCP
PILO LIL – RAHUE (EMP. RP 46)
PUCED SECTORS, CLAY WITH CROSS SECTIONS. ROCKFALL. EQUIPMENT OPERATING. PRESENCE OF ANIMALS BY TRANSHUMANCE
TCP
RAHUE (EMP. RP 46) – ALUMINATED
POCEED AND MUD SECTORS, CARRYING CHAINS.
TCP
ALUMINé – LITRÁN (EMP. RP 13)
SECTORS WITH ICE. POOLED SECTORS, MUD AND PILLED SECTORS. PRESENCE OF ANIMALS BY TRANSHUMANCE. CARRYING CHAINS.
TCP
EMP. RP 13 (LITRÁN) – AXED PINE
SNOW PACKING. REDUCED VISIBILITY DUE TO WIND.
I
EMP. RN 40 (CALCATRE) – LAS COLORADAS – FORTIN 1º DE MAYO (EMP. RP 46)
POOLED SECTORS.
TCP
LONCOPUé – RISCOS BAYOS – HUALCUPéN
WET ASPHALT TAPE. PRESENCE OF ANIMALS BY TRANSHUMANCE
TCP
HUALCUPEN – CAJÓN CHICO – CAVIAHUE
WET ASPHALT TAPE. PRESENCE OF ANIMALS BY TRANSHUMANCE
TCP
CAVIAHUE – COPAHUE
WET ASPHALT TAPE. CAVIAHUE- EMP. PR No. 27: POOLED SECTORS. EMP. RP Nº 27 UP TO COPAHUE: CAUTION EQUIPMENT OPERATING IN RIPIDATION TASKS. PRESENCE OF ANIMALS BY TRANSHUMANCE
TCP
EMP. RP 33 – HUNCAL – RANQUILóN – EMP. RP 4
POOLED SECTORS.
TCP
LONCOPUé – HUNCAL (EMP. RP 10)
POCKED SECTORS, WITH BARROY SERRUCHO.
TCP
EMP. RN 40 – QUINTUCO – EMP. RP 10
POOLED SECTORS.
TCP
EMP. RP 2 – WAYLE
NO WINTER MAINTENANCE
I
WAYLE – LAGUNA TRóMEN – EMP. RP 53
NO WINTER MAINTENANCE
I
ANDACOLLO – THE MICHES
POOLED SECTORS.
TCP
ANDACOLLO – HUINGANCO
POOLED SECTORS.
TCP
CHOS MALAL – BARRANCAS
WET ROAD. ZONE WITH LOOSE ANIMALS. MANDATORY CARRYING OF CHAINS.
TCP
LAS LAJAS (EMP. RN 242) – CHOS MALAL
WET ROAD. ZONE WITH LOOSE ANIMALS. MANDATORY CARRYING OF CHAINS.
TCP
ZAPALA – LAS LAJAS (EMP. RN 242)
WET ROAD. ZONE WITH LOOSE ANIMALS. MANDATORY CARRYING OF CHAINS.
TCP
ZAPALA – LA RINCONADA (EMP. RN 234)
WET ROAD. SECTORS WITH RAIN. MANDATORY CARRYING OF CHAINS.
TCP
LA RINCONADA – JUNÍN DE LOS ANDES – SAN MARTIN DE LOS ANDES
WET ROAD. SECTORS WITH RAIN. MANDATORY CARRYING OF CHAINS.
TCP
SAN MARTIN DE LOS ANDES – ACC. CHAPELCO
WET ROAD. SECTORS WITH RAIN. MANDATORY CARRYING OF CHAINS.
TCP
ACC. CHAPELCO – LAGO VILLARINO
WET ROAD. SECTORS WITH RAIN. MANDATORY CARRYING OF CHAINS.
TCP
LAKE VILLARINO – EMP. RN 231 – VILLA LA ANGOSTURA
WET ROAD. SECTORS WITH RAIN. MANDATORY CARRYING OF CHAINS. ZONES WITH LOOSE ANIMALS.
TCP
VILLA LA ANGOSTURA – EMP. RN 237
WET ROAD. SECTORS WITH RAIN. MANDATORY CARRYING OF CHAINS.
TCP
EMP. RN 237 – PTE RíO LIMAY (LTE C/RíO NEGRO)
WET ROAD. SECTORS WITH RAIN. MANDATORY CARRYING OF CHAINS.
TCP
ACC QUILA QUINA (RN 40)
POOLED SECTORS AND MUD. MANDATORY CARRYING OF CHAINS.
TCP
acc. BEAUTIFUL LAKE (RN 40)
POOLED AND CLAY SECTORS
TCP
ACC. CAMPING CATRITRE (RN 40)
POOLED SECTORS AND MUD.
TCP
EMP. RP 43 (CAEPE MALAL) – AQUIHUECO – CAJÓN DEL CURI LEUVú
POOLED SECTORS. SECTORS WITH MUD.
TCP
CHOS MALAL – THE MENUCOS – THE SPRING
T
THE SPRING – THE PLAIN – ANDACOLLO
T
ANDACOLLO – CAYANTA – BELLA VISTA – THE SHEEP
T
THE SHEEP – VARVARCO – Aº AILINCO
UNTIL MATANSILLA POCEATED SECTORS. REST: IMPASSABLE
TCP
EMP. RN 40 (10 KM FROM ZAPALA) – EMP. RP 24
SECTORS WITH POTHOLES. PRESENCE OF LOOSE ANIMALS. EQUIPMENT OPERATING. LLAO – LLAO: STRONG GUSTS OF WIND.
TCP
EMP. RP 24 – RAHUE (EMP. RP 23)
POOLED SECTORS AND MUD. SECTORS WITH ICE. CARRYING CHAINS.
TCP
RAHUE (EMP. RP 23) – LAGO QUILLéN – LAGO HUI HUI
POOLED SECTORS AND MUD. CARRYING CHAINS.
TCP
SAN MARTIN DE LOS ANDES – PASS HUA HUM
POOLED SECTORS. SECTORS WITH MUD.
TCP
ACC. BANDURRIAS (RP 48)
POOLED SECTORS. SECTORS WITH MUD.
TCP
ACC. CHACHIN – LAKE QUEEN (RP 48)
POOLED SECTORS. SECTORS WITH MUD.
TCP
PASO HUA HUM
POOLED SECTORS. EQUIPMENT OPERATING. STEP INT. HUA HUM ENABLED FROM 9 TO 8 PM.
TCP
EMP. RN 237 – EMP. RN 234
POOLED SECTORS AND MUD.
TCP
EMP. RP 7 – EMP. RP 8
EQUIPMENT OPERATING
TCP
EMP. RN 40 – EMP. RP 62 (COLOHUINCUL)
POOLED SECTORS AND MUD.
TCP
EMP. PR 23 – LANÍN PN COVER
WET ASPHALT TAPE.
TCP
HOME PN LANÍN – PASS MAMUIL MALAL (LTE WITH CHILE)
POOLED SECTORS AND MUD.
TCP
PASS MAMUIL MALAL (EXTROMEN)
POOLED SECTORS AND MUD. PASS MAMUIL MALAL ENABLED FROM 9 AM TO 6 PM.
TCP
JUNÍN DE LOS ANDES (EMP. RN 40) – PTE CHIMEHUÍN RIVER – LAKE PAIMúN
POOLED SECTORS AND MUD. EQUIPMENT OPERATING, UNRIPPED TASKS
TCP
SAN MARTÍN DE LOS ANDES (EMP. RN 40) – LAKE LOLOG AND CARRUHUé – LAHUENCó EPULAFQUEN – CARRIRRIñE PASS
POOLED SECTORS AND MUD. LOLOG ACCESS WITH CAUTION: EQUIPMENT OPERATING. CARIRRIñE: IMPASSABLE.
TCP
EMP. RN 40 – MELIQUINA RIVER PTE – FILO HUA HUM RIVER PTE – CÓRDOBA PASS – CONFLUENCIA (EMP. RN 237)
POOLED SECTORS AND MUD. RECOMMENDED MAX SPEED 20 KM/H. FROM IMPASSABLE DPV CAMP
TCP
EMP. RP 63 – CALEUFú – LAGO FILO HUA HUM
POOLED SECTORS AND MUD.
TCP
CONFLUENCE – VILLA TRAFUL – EL PORTEZUELO
POOLED SECTORS AND MUD. acc. CUYIN APPLE TREE: STONE DETACHMENT. VILLA TRAFUL – EL PORTEZUELO: WORK IN PROGRESS, RESPECT SIGNS. RECOMMENDED MAX SPEED 20 KM/H
TCP
EMP. RN 40 – BAYO HILL
SECTORS POOLED AND WITH MUD.
TCP
EMP. RN 40 (6 KM FROM VILLA LA ANGOSTURA) – CARDENAL SAMORÉ PASS
WET ROAD. SECTORS WITH RAIN. POSSIBLE SNOW IN HIGH LEVEL. MANDATORY CARRYING OF CHAINS.
TCP
PASS CARDENAL SAMOré
WET ROAD, SHORTS WITH SNOW. MANDATORY CARRYING OF CHAINS. STEP ENABLED.
TCP
LA RINCONADA (EMP. RN 40) – PTE COLLÓN CURá (EMP. RN 237)
MANDATORY CARRYING OF CHAINS.
TCP
EMP. RN 22 (ARROYITO) – STONE OF THE EAGLE
MANDATORY CARRYING OF CHAINS.
TCP
STONE OF THE EAGLE – PTE COLLÓN CURá (EMP. RN 234)
MANDATORY CARRYING OF CHAINS.
TCP
PTE COLLÓN CURA (EMP. RN 234) – CONFLUENCE (EMP. RP 63 AND 65)
ZONE WITH LOOSE ANIMALS. MANDATORY CARRYING OF CHAINS.
TCP
CONFLUENCE – EMP. RN 40
ZONE WITH LOOSE ANIMALS. MANDATORY CARRYING OF CHAINS.
TCP
LAS LAJAS (EMP. RN 40) – EMP. RP 21
SECTORS WITH ICE. CARRYING CHAINS.
TCP
EMP. RP 21 – EMP. RP 23 (A 500M CUSTOMS AX PINE)
SECTORS WITH ICE. CARRYING CHAINS.
TCP
EMP. RP 23 – AX PINE PASS
LOW ADHESION DUE TO ICE. CARRYING CHAINS.
TCP
STEP PINE AX
ENABLED FROM 10.30 PM.
I
2023-05-01 13:14:20
1682947786
#State #Neuquén #routes #today #Monday