Bridge Replacement Update: Avoid Traffic Delays on Western Ring – Summer 2024 Opening

2023-09-23 05:27:00

The Flemish traffic agency (Agentschap Wegen en Verkeer) recommends that motorists avoid the western part of the ring or pass through Tervuren and Waterloo.

A truck loaded with paper hit the underside of the bridge in August 2019. The vehicle caught fire and damaged one of the bridge’s steel beams. Since the accident, the structure has been closed to traffic.

The Agentschap Wegen en Verkeer is working on replacing the bridge, which will have two lanes for pedestrians and cyclists, each 2.5 meters wide. A 3 meter wide lane for cars is planned in the middle of the road, motorists will have to cross the bridge in turns.

The bridge should normally be put into service in the summer of 2024.

1695522492
#Demolition #Drasop #bridge #disruptions #expected #Brussels #ring #road #weekend

Photo of author

Alexandra Hartman Editor-in-Chief

Editor-in-Chief Prize-winning journalist with over 20 years of international news experience. Alexandra leads the editorial team, ensuring every story meets the highest standards of accuracy and journalistic integrity.

Thrilling Comeback: Tampa Bay Rays Defeat Toronto Blue Jays 7-6 with Heroic Plays and Record-Breaking Attendance

who will succeed Bernard Arnault? Will the pro-crypto side win?

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.