Brussels Ring (R0) Completely Closed for Road Renewal Project: Traffic Diversion and Updates

2023-08-18 06:40:38

For the second consecutive weekend, the Brussels ring (R0) will be completely closed to traffic, from Friday evening, towards the capital between the interchange towards Genappe and that of Groenendael. This is the second phase of a major road renewal project that extends from Braine-l’Alleud to the Flemish Region, said Wednesday Sofico, the manager of the Walloon motorway network.

From this Friday at 10:00 p.m., the R0 will be completely closed between the “Genappe” and “Groenendael” interchanges until Monday 4:00 a.m. to allow the resurfacing of the roads. Work will be carried out 24 hours a day.

To reach Brussels, a diversion will be set up from the Haut-Ittre interchange and all the roads converging there (E19/A7, E411/A4, N25, N28, N280, etc.). Users will have to take the West Ring towards Wauthier-Braine. Those who will still drive on the East Ring to reach a local destination will be obliged to leave the ring at exit n°26 “Genappe”.

Read also Vilvoorde Viaduct: in eight years, we went to the Moon

Last weekend, a hundred men were hard at work night and day to rehabilitate the portion between Waterloo and the regional boundary. Some 4,000 tons of asphalt were removed before being replaced.

In all, three weekends of work, requiring a total closure of traffic to the capital, will be necessary to complete the site.

1692345638
#Brussels #portion #ring #completely #closed #weekend

Photo of author

Alexandra Hartman Editor-in-Chief

Editor-in-Chief Prize-winning journalist with over 20 years of international news experience. Alexandra leads the editorial team, ensuring every story meets the highest standards of accuracy and journalistic integrity.

La Casa de Magaly Parody: Hilarious Characters and Gossip Galore on JB en ATV

Xi calls for measures to mitigate disastrous floods in China

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.