Bugnenets friendliness supplement

At the bottom of the slopes of Bugnenets, while waiting for the snow, a new multifunctional building is under construction. Construction started a week ago…

This project represents an investment of approximately 500,000 francs. It is financed equally by the Bugnenets-Savagnières resort, located between the canton of Neuchâtel and the Bernese Jura, and by the Swiss Ski School of Neuchâtel-Les Bugnenets. Its purpose is to bring together and modernize the services of the two entities: the cash desks and the start of the Fornel ski lift for the first, as well as an office and equipment room for the second.

Serge Rohrer is a member of the board of directors of Bugnenets-Savagnières. For him, thanks to this new structure, the two entities will be able to make their infrastructures more user-friendly:

The inauguration is scheduled for the start of the winter sports season. Investing in a ski area in this period of climatic uncertainty, there are some that it would set back. This is not how Serge Rohrer sees things:

Regarding the possibility of installing snow cannons or other similar structures at Bugnenets-Savagnières, the question is still under consideration. Initial contacts have been made with the circles concerned and several technical solutions have been studied. /jhi

Photo of author

Alexandra Hartman Editor-in-Chief

Editor-in-Chief Prize-winning journalist with over 20 years of international news experience. Alexandra leads the editorial team, ensuring every story meets the highest standards of accuracy and journalistic integrity.

Jordan Poole is officially the 2022 12-meter bomb specialist

Pique challenges Xavi: I will play basic even if I sign the best defender in the world!

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.