The agency said that the uncrewed Dream Chaser spaceplane just secured a re-entry license authorising up to four landings a year at Vandenberg Space Force Base in California, as Raksha Anirveda reported.
The authorization also permits touchdowns at the space shuttle landing facility at NASA’s Kennedy Space Center in Florida, according to Space.
Sierra Space representatives posted on X on November 9, 2026, writing, “Thank you to the FAA for its collaboration and support of commercial space innovation,” as noted by Space. The Federal Aviation Administration’s environmental assessment found that the vehicle’s return would not significantly impact the quality of the human environment under the National Environmental Policy Act.
Another milestone for #DreamChaser! The @FAANews has issued Sierra Space a license authorizing Dream Chaser to reenter and land at Vandenberg Space Force Base. Thank you to the FAA for its collaboration and support of commercial space innovation. pic.twitter.com/qIJgQL54CA
For potential returns at Vandenberg, temporary and short-duration sonic booms are anticipated. The federal agency stated they would be limited to 1.1 pounds per square foot or less, which is similar to a thunderclap. Interesting Engineering reported that the newly issued license identifies the California installation as the landing destination and provides an approved runway for the upcoming flight, though the launch date still depends on rocket availability.
Tenacity's Lifting-Body Design Fits Inside Payload Fairing
The 30-foot-long spacecraft, named Tenacity, combines a lifting-body design with folding wings to fit inside its launch vehicle’s payload fairing, as detailed by Interesting Engineering. The vehicle can carry approximately 12,100 pounds of cargo to orbit and return with 4,080 pounds. Sierra Space said that returning cargo experiences less than 1.5 times Earth’s gravity, offering a runway landing option that benefits sensitive equipment and time-sensitive research materials requiring careful handling.

Dream Chaser has been in development for more than two decades, initially entering NASA’s Commercial Crew series to ferry astronauts. In 2014, NASA selected Boeing’s Starliner and SpaceX’s Crew Dragon instead.
The program then pivoted to a cargo variant, securing a contract in 2016 to conduct at least six uncrewed resupply flights to the International Space Station. Development delays repeatedly pushed those missions into the future, while the launch vehicle shifted from United Launch Alliance’s Atlas V to the Vulcan Centaur rocket.
The spaceplane missed Vulcan’s second flight in October 2024 because it was not ready in time. In September 2025, NASA and Sierra Space revised their agreement, removing the space station docking requirement from the initial demonstration and arranging for a free-flight test mission instead.
Sierra Space Targets Spring 2027 Launch from Florida
Sierra Space is now targeting spring 2027 for Dream Chaser’s first free-flying test mission in low Earth orbit, launching from Florida aboard a Vulcan Centaur rocket. The company anticipates a mix of future missions for NASA, the U.S. military, and private companies, including consortiums building commercial space stations like Orbital Reef.
While the regulatory approval removes an important barrier, Tenacity still needs its launch vehicle and remaining mission preparations before its runway return becomes a reality. The FAA license gives the company permission to bring the vehicle back to Vandenberg, but the spaceplane must still prove itself in flight.
