Nepal observed a national day of mourning on Monday, September 7, 2026, marking thirteen days since catastrophic floods struck the nation and neighboring Tibet. According to Nepal’s disaster management agency, the August 26 disaster resulted in more than 1,300 deaths and left approximately 5,000 people missing, including foreign nationals.
In accordance with Hindu traditions predominantly practiced across Nepal, the thirteenth day signifies the conclusion of primary mourning periods. Close family members traditionally remain confined to their homes during this stretch while relatives offer condolences. On Monday, families conducted final memorial rites to pray for the souls of the deceased. Because many bodies were never recovered, several relatives performed symbolic cremation ceremonies. According to reporting from the Associated Press, performing the essential Hindu final rite without physical remains provided families with a measure of spiritual release.
The government formally declared the day of mourning, ordering all flags at official government offices lowered to half-staff. Candlelight vigils flickered across Kathmandu as residents gathered to honor those lost.
Protests Emerge Over Search and Rescue Pace
While memorial rituals concluded, public frustration grew regarding the ongoing search for missing persons. Relatives of missing workers gathered near the offices of the prime minister and key ministries in Kathmandu to demand accelerated rescue operations. Protestors focused particular criticism on the handling of hydropower infrastructure sites.

Authorities reported that rescue operations have concentrated on 12 distinct hydropower projects. Roughly 900 workers remain unaccounted for at these facilities, with approximately 500 believed trapped inside damaged subterranean tunnels. Specialized international response teams from India, China, South Korea, and the United States have deployed to assist local personnel in sifting through debris and unstable structures.
Demonstrators argued that responses at specific project sites had been inadequate. Sumana Shrestha joined protestors holding a photograph of her 55-year-old husband, a consulting geologist at the Trishuli hydropower project office, which was completely buried by debris.

“We are here because we have not heard of any rescue attempt on this project, but it has been 13 days already,” Shrestha stated, as reported by the Associated Press. “The only thing we have been able to do is pray to God and hope for a miracle.”
Mahesh Prasad Shrestha, carrying a picture of his missing brother Niraj Shrestha—a 52-year-old engineer at the same site—criticized the timing and scale of equipment deployment. He noted that authorities only dispatched a small excavator via helicopter nearly a week after the disaster, adding that larger heavy-lift aircraft should have been sourced immediately from neighboring countries like China or India.
Recovery operations yielded isolated moments of success late last week, with rescuers pulling two Nepalese workers alive from a plant on Friday, followed by the extraction of a Chinese national from the same facility on Saturday.
Institutional Response and Next Steps
International and domestic specialized teams continue to probe blocked tunnels and sediment-choked project offices along rushing waterways such as the Bhotekhoshi River. Government ministries face mounting pressure from families and public advocates to expedite heavy equipment deployment to remote facilities as search operations enter their third week.