Chapter proceedings have been opened as a result of “regardless of intensive efforts” the acquisition of recent buyers as deliberate within the restructuring plan was not achieved. This meant that the mandatory liquidity was not obtainable. It may now be assumed that the corporate shall be exploited.
Geomix couldn’t afford the second installment. The renovation subsequently failed. The annual loss for 2023 amounted to round 1.7 million euros. There’s a revival of registered and acknowledged previous claims. 74 staff and 192 collectors are affected. Wages and salaries have been paid as much as and together with March 2024. The whole liabilities quantity to 16.3 million euros (at guide worth).
Related posts:
Euromillions result for Friday August 4, 2023: so, winners?
SNB in the first quarter of 2022 – Huge loss at the National Bank
Coris Bank International-BF: 19 billion CFA francs to be distributed among 15 thousand shareholders
Navigating the Maze: The Experience of Shopping at Ikea and Decathlon
BNB Chain confirms the suspension of the BSC due to a "possible exploit"
Analysis-Southern Europe braces for climate change-fuelled summer of drought By Reuters
2024 Investment Strategies: Navigating Rate Cuts and Electoral Uncertainties
90% of Germans fear inflation and abandon consumption habits