KAI Engineering Blambangan Express Train Route Due to Flooding in Semarang – 2024-03-17 05:13:34

Floods submerge Tawang station (Antara) PT Kereta Api Indonesia Operation Area 9 Jember engineered the operational pattern of the Blambangan Express train for the Ketapang Banyuwangi-Semarang connection on Thursday evening due to flooding in Semarang. “Apart from the Pandalungan train, operational pattern engineering was also carried out on the Blambangan Express train which departed at … Read more