Understanding France’s Nuclear Safety Authority and Operator EDF’s Annual Review Process

2024-01-20 20:12:00

Finally, without detailing the entire procedure, the review involves the operator, EDF, which is also preparing to build 1 to 1.5 nuclear reactors each year, and the ASN (Nuclear Safety Authority). On the basis of various reports, checks and possible modifications, it communicates to the government its conclusions on the safety status of the installations and the merits (or not) of extending operation.

1705804568
#Extension #nuclear #reactors #years #State #opinion

Photo of author

Alexandra Hartman Editor-in-Chief

Editor-in-Chief Prize-winning journalist with over 20 years of international news experience. Alexandra leads the editorial team, ensuring every story meets the highest standards of accuracy and journalistic integrity.

Sabarimala Guruthi Puja and Ceremony at Malikpuram: A Culmination of Devotion

Belgrano fell with Peñarol in Montevideo

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.