Watch the Maspero and Gamal Abdel Nasser metro station on the third metro line after their opening.. Photos

I started Ministry of Transportation Starting the trial operation with passengers for the first part of the third stage of the third metro line (3A ), which extends from Ataba station to Kit Kat station, with a length of 4 km, which includes (4) tunnel stations (Nasser – Maspero – Safaa Hegazy – Kit Kat), passing through the tunnel under the Nile from Maspero station to Safaa Hegazy station in Zamalek, after Expiry of the trial run period without passengers, conducting experiments for the running of the train and tests for signals and control of the path.

The seventh day toured the Maspero and Gamal Abdel Nasser metro station, where the company’s management was keen to provide all means of comfort and guidance for citizens, and the service was characterized by the highest levels of efficiency.

This came in accordance with the directives of President Abdel-Fattah El-Sisi, the President of the Republic, to operate the first part of the third phase of the third line of the subway for passengers on the occasion of the celebration of the glorious October 6 feasts, and to facilitate the movement of the movement of the people of the areas surrounding the High Court and the Maspero areas of Zamalek and Kit Kat.


side-of-station

side-of-the-stairs-metro
side-of-the-stairs-metro

Side of Ramses metro station
Side of Ramses metro station

side-of-entrance-station
side-of-entrance-station

berth-station
berth-station

Maspero-metro-station stairs
Maspero-metro-station stairs

Subway
Subway

Gamal Abdel Nasser Station
Gamal Abdel Nasser Station

Maspero-station
Maspero-station

Maspero-metro-station
Maspero-metro-station

Terminal-entrance
Terminal-entrance

Minister Kamel Al-Wazir’s visit began with a visit to Nasser Station, which is an interchange station with the first metro line, whose total area will become after the opening of this part of the line 10,000 square meters, consisting of 4 floors, 52 ticket gates and 4 automatic ticket machines. TVM) for tickets, and 37 escalators from street level to the station platform.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.