[사회][제보는Y] ‘Grey water gurgles in the creek’… Construction company caught secretly leaking wastewater

[앵커]

A construction company was caught dumping wastewater from a construction site in a nearby creek in Gwangju, Gyeonggi-do.

Heavy metals such as lead and arsenic were detected in the wastewater discharged into the creek, and it was found that it had flowed to the Paldang Waterworks Protection Area.

The tip is reported by Y, reporter Yoon Seong-hoon.

[기자]

Turbid water flows through narrow furrows.

You can’t see the inside at all, so you can mistake it for a lump of gray paint.

This Silgaecheon, located in Chool-eup, Gwangju-si, Gyeonggi-do, was clear enough to see the bottom, but at some point, unknown water began to flow in and turn into gujeong water.

[현장 목격자 : 두 달 전부터 회색빛 물이 방류돼서 매일 방류되는 걸 보고 오전 시간대에만 특정해서 방류하는 걸 보고 신고했습니다.]

It didn’t just change color.

Heavy metals such as copper, lead, and arsenic, which should not be detected in water, were also detected in large quantities.

When it accumulates in the body, it is a component that can cause cancer and nervous system disorders.

This polluted water flowed through the nearby Sinwolcheon and Gyeongancheon Streams to the Paldang Water Source Protection Area.

[도윤석 / 경안천시민연대 사무국장 : 신월천으로 바로 유입되는 실개천인데, 실개천은 경안천하고 4~5km밖에 안 떨어졌습니다. 경안천은 팔당호로 바로 유입되고 그 물을 수도권 시민들이 먹고 있는 것이죠.]

Looking back on the source of pollution, the problem was the construction site of a logistics center nearby.

The wastewater from the construction site was flowing into the creek without being properly filtered.

This is where the water discharged from the construction site flows.

The turbid water gushes out and leads to the Silgaecheon.

As a result of the local government investigation, wastewater management at the construction site was a mess.

If groundwater flows in during excavation and muddy water is produced, it is necessary to filter out pollutants such as heavy metals sufficiently or to entrust the treatment with a treatment company, but the construction company did not take any action.

Because of this, he received administrative guidance from the local government four times, but it was investigated that all of them were completely ignored.

[공사장 관계자 : 일정 시간 침사시켜서 나가야 하는데 장비가 가동해야 하니까 그 물을 침사할 시간 없이 계속 나가서 그렇게 된 거예요.]

After receiving the complaint from the local government, the police plan to launch a full-scale investigation by calling in the construction company officials in the near future.

This is YTN Yoon Seong-hoon.

YTN Yoon Seong-hoon ([email protected])

※ ‘Your report becomes news’
[카카오톡] Search YTN to add a channel
[전화] 02-398-8585
[메일] [email protected]

[저작권자(c) YTN 무단전재 및 재배포 금지]

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.