Dublin Port Tunnel Reopens After Crash; 30-Minute Delays on M1 from Airport

Dublin Port Tunnel reopened Wednesday evening but 30-minute delays persisted on the M50 southbound from M1 junction 2 at Dublin Airport as metered toll release held drivers back.

Dublin’s Port Tunnel reopened on Wednesday evening, Dublin Live reported, but the tailbacks it left behind stretched back to Dublin Airport and Finglas, with drivers held at the mouth of the tunnel in small groups.

The closure followed a collision at the tunnel exit that stopped inbound traffic entirely. Transport Infrastructure Ireland, which operates the crossing, reported the incident and warned drivers directly: “Signals may halt traffic on approach. Some delays to your journey may occur. When approaching the tunnel reduce your speed, be prepared to stop, and drive with caution.”

Dublin Live recorded delays of 30 minutes on the M50 southbound from M1 junction 2 at Dublin Airport after the crash was cleared, with metered release at the toll booths designed to stop a fresh tailback forming there.

A taxi driver protest was due to run from 4pm to 6pm near Dublin Airport, and anyone heading that way was advised to allow extra time.

Dublin Port Tunnel Reopens After Crash; 30-Minute Delays on M1 from Airport
Photo: globeverge.com

According to Dublin Live’s reporting, two slow-moving taxi convoys were set to converge on the Airport Roundabout. One would leave the Crowne Plaza at Northwood in Santry, the other from Airside Retail Park in Swords, and organisers expected the combined procession to slow the airport approach roads through the evening peak.

That put the protest on a collision course, figuratively, with the tunnel fallout: the M1 approach to the airport was already carrying the longest delays of the evening, and the convoys were routed through the same corridor from the north city and Swords.

The collision at junction 15, Carrickmines, has been cleared and all northbound lanes are open, but delays of 25 minutes remain running back from junction 16 at Cherrywood. By late evening, Dublin Live reported all lanes open there, though the 25-minute delay lingered.

Southbound, the picture flipped: a crash at junction 13, Dundrum, was cleared quickly, but the southbound carriageway stayed heavy anyway as drivers slowed to look at the aftermath. Southbound delays of 30 minutes remained from the M1 junction after the Ballymun collision was cleared.

A breakdown blocked the right lane on Leeson Street Lower at the Hatch Street lights, a crash snarled the Rathbeale Road in Swords past Glen Ellan Road, and the R132 crawled toward Blake’s Cross. By the final updates, most had cleared and traffic was moving well.

GlobeVerge, which has tracked the story since it first appeared, shows it carrying a single newsroom report, Dublin Live’s own live coverage of the evening.

The practical picture for Wednesday night: the tunnel is open, the hard shoulder is free, and the last outstanding delays Dublin Live logged were the 30 minutes from Dublin Airport on the M1 and 25 minutes from Cherrywood on the M50, both easing as the protest window closed at 6pm.

Photo of author

Newsroom

Newsroom at Archyde.

Ballyshannon Girl (11) to Dance on Late Late Toy Show, Family Seeks Ticket for Nanny

BOYNEXTDOOR 2027 Season’s Greetings Pre-Order Opens Nov 20 With NFC-Enabled Digital Code