Giant axes and projects that changed the look of Alexandria in the New Republic… Details

Alexandria governorate witnessed a huge construction boom in giant development projects during the last period From the development of roads, bridges and major axes to eliminate theTraffic congestion and facilitating transport services at the ports of Alexandria, Dekheila and Abu Qir.

The axis of Field Marshal Fouad Abu Zekry includes 18 bridges.

The Al-Taameer Axis Road, which bears the name of Field Marshal Fakhry Abu Zekry Axis, is one of the important and main roads with a length of 35 km and connects the Al-Qabbari area west of Alexandria, Sidi Kerir Al-Matar and Burj Al-Arab in the west of the governorate. It was inaugurated by President Abdel Fattah Al-Sisi since the days of K.aAn extraordinary achievement, and the state spared no effort to complete the project on time and with the highest possible quality.

The axis of Field Marshal Fouad Abu Zekry includes the construction of 18 bridges with a length of 18 km. The axis project includes the installation of 800 lighting poles with a height of 25 meters with the latest modern technology, a dima system that works according to traffic density to save energy, as well as the installation of 1500 lighting poles with a length of 10.5 meters and a new electricity network. With a length of 40,000 meters along the new Marshal Fouad Abu Zekry axis road in Alexandria.

Bridge 54, the artery west of Alexandria.

The construction of Bridge 54 is considered one of the most important projects that the Alexandria Port Authority is working on to establish it to solve the traffic crisis and the accumulation of transport vehicles that leave the port to the main roads, which may cause accidents and severe traffic congestion. It starts west of Alexandria, and it is a free link linking Alexandria Port with the international coastal road The highway in the Bab 54 area (Bridge 54), which is 2.30 km long and 17.6 meters wide.


Bridge 45 Alexandria Corniche.

The project of constructing a tunnel and bridges on Street 45 on the Corniche Road is a civilized shift on the Alexandrian Corniche, not only in terms of aesthetics and civilization, but also contributes to solving the traffic crisis on the Alexandrian Corniche, especially in the summer, when it is crowded to receive thousands of vacationers annually.

The Bridge 45 project consists of a tunnel that starts from Sadat Street, with a width of 19 meters, consisting of 3 lanes of entry and 3 lanes of exit, with a length of approximately 150 meters. meters, as well as a tunnel on the right side and a tunnel on the left side for pedestrians with a width of 2 and a quarter meters and a height of 3 meters.

The bridge ends from the sea side by turning to the left with 2 bridges consisting of 3 lanes of exit and 3 lanes of entry for each of them, and they are separated from each other at a distance after the end of the lanes with a length of approximately 200 meters, and the exit from the tunnel is approximately 120 meters long. The project includes a walkway (bridge ) on the Corniche road, parallel to the sea and the bridge, with a length of approximately 250 meters, a width of 6 meters, and a height of 6 to 8 meters above sea level.


Abu Qir axis in Alexandria.

Abu Qir axis is one of the most important new traffic arteries, with a length of 21 kilometers. At a time when stevedoring companies began to pay attention to Abu Qir port as one of the most important ports in Alexandria, as well as linking the Abu Qir axis with the Mahmoudia axis road and the international coastal road, in order to relieve pressure on the east of the governorate. Alexandria, especially the areas of Abu Qir and Mamoura Al-Balad.


The coastal road

Bridge 45
Bridge 45

Bridge 54 West
Bridge 54 West

Abu Qir axis
Abu Qir axis

The axis of Field Marshal Fouad Abu Zekry
The axis of Field Marshal Fouad Abu Zekry

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.