Hôpital Pierre-Boucher will convert staff lockers and laundry rooms into clinics after stretcher occupancy reached 192 percent on November 17.
Staff lockers and the laundry room at Hôpital Pierre-Boucher in Longueuil are slated for conversion into external clinics as the facility grapples with severe overcrowding.
The hospital utilizes every possible corridor to install patients on stretchers, having previously converted an old archives room into an emergency zone.
During a visit on November 17, stretcher occupancy hit 192 percent, La Presse reported. Nurses stationed a patient right in front of their work area simply to keep watch, as some of the sick individuals suffer from cognitive impairments. An emergency assistant head nurse, Brigitte Perras, had a workspace set up in a corner.
Dr. Jocelyn Dodaro, medical and professional services director at Santé Québec Montérégie-Est, said, “We have several clinicians, doctors, and professionals who practically work in closets.” He added that cancer patients might receive chemotherapy treatments in the newly converted spaces, while external clinics are currently very cramped on the upper floors.
Santé Québec Montérégie-Est is investing 5.5 million dollars to renovate these remaining available spaces while a larger, modernized project for the emergency room and short-stay hospitalization unit remains in the planning phase within the 2026-2036 Québec Infrastructure Plan, according to Lapresse.
The main employee locker room will host the external clinics, and employees will no longer share a locker with a colleague, with personal space equaling half a current locker, according to project director Cathy Martel.
Clean linen cart assembly will move into the old laundry room, as the health authority has outsourced the washing of soiled linens to a private provider for about two years. The existing wash tunnel will be dismantled, with usable parts salvaged as spare parts for the hospital in Saint-Hyacinthe, as noted by technical services director Éric Lapierre.
“I was very happy not to be in the corridors where people walk around and bump into stretchers,” said Pierre Haineault, a 59-year-old patient treated for chest discomfort who found the emergency waiting room overcrowded. He also mentioned that finding a way through the emergency department was not easy for his spouse, who uses an electric wheelchair.
Inaugurated in 1982, Hôpital Pierre-Boucher serves as the regional health centre for 245,000 people across several municipalities. The 329-bed facility provides general, specialized, and ultraspecialized care, recording 3,400 births annually.
Severe strain on the institution stems from its emergency department, which handles 55,000 visits per year. Despite a 60-million-dollar government investment and expansion in 2003, the existing capacity struggles to meet regional demands, contributing to extreme overcrowding where stretchers line corridors and waiting spaces.
Health officials hope the broader emergency expansion project advances to the implementation stage in the upcoming 2027-2037 infrastructure plan. However, Finance Minister Nicolas Marceau said that the government has identified a 65-billion-dollar shortfall, meaning several infrastructure projects face cancellation or optimization.