| Ruta |
Section Status |
Transit |
| BIG PORTEZUELO – CHIHUIDOS – EMP RP 7 |
POWERED SECTORS |
TCP |
| CHOS MALAL – TRICAO MALAL – COURT HUINGANCO |
POLED AND MUD SECTORS. COLLAPSES. CARRYING CHAINS |
TCP |
| EMP. RN 40 – MARIANO MORENO – EMP. RP 16 |
ROAD WITH DEFORMATIONS. |
TCP |
| EL HUECÚ – MALLÍN LARGO – NAUNAUCO – EMP. RN 40 |
POCEED, SAW AND HURELLONES SECTORS. |
TCP |
| EMP. RP 7 (PUNTA DE AGUA) – RINCON DE LOS SAUCES |
EQUIPMENT OPERATING. INTENSE TRAFFIC |
TCP |
| OCTAVIO PICO – CATRIEL CRUISE |
POCHED SECTORS. CARRYING CHAINS. |
TCP |
| CATRIEL CRUISE – RINCON DE LOS SAUCES |
SECTORS WITH POTHOLES. CARRYING CHAINS. |
TCP |
| RINCON DE LOS SAUCES – PUESTO HERNáNDEZ – EMP. RN 40 |
POCEED SECTORS. CARRYING CHAINS. |
TCP |
| CHOS MALAL – EL CHOLAR |
POCHED SECTORS, SAW. IT IS RECOMMENDED TO CARRY CHAINS |
TCP |
| EL CHOLAR – PICHACHEN |
POCHED AND SAW SECTORS |
TCP |
| NEUQUÉN – CENTENARY – EMP RP 51 |
INTENSE TRAFFIC. CONSTRUCTION WORK, DEVICES, ROAD REDUCTION |
TCP |
| LTE C/RÍO NEGRO – EL CRUCE (EMP RP 8) |
INTENSE TRAFFIC. |
TCP |
| EMP RP 8 (EL CRUCE) – YEAR (EMP. RP 17) |
INTENSE TRAFFIC. |
TCP |
| AñELO (EMP. RP 17) – EMP. RP 5 |
INTENSE TRAFFIC |
TCP |
| EMP. RP 5 – LOS RANQUILES – EMP. RN 40 |
POLED AND MUD SECTORS. CROSS SECTIONS.. OPERATING EQUIPMENT |
TCP |
| EMP. RP 51 – EMP. RP 7 |
INTENSE TRAFFIC. |
TCP |
| EMP. RP 7 (EL CRUCE) – CATRIEL CRUISE |
POCHED SECTORS. EQUIPMENT OPERATING. |
TCP |
| THE CRUISES – MOQUEHUE (EMP. RP 13) |
POLED AND MUD SECTORS. STRAY ANIMALS. EQUIPMENT OPERATING. |
TCP |
| MOQUEHUE – ÑORQUINCO |
POCHED SECTORS, OPERATING EQUIPMENT |
TCP |
| ÑORQUINCO – EMP. RP 23 |
POWERED SECTORS |
TCP |
| ZAPALA – FIRST PINES |
SECTORS WITH POTHOLES, LOOSE ANIMALS. |
TCP |
| FIRST PINES – LITRAN |
POCHED SECTORS, LOOSE ANIMALS. EQUIPMENT OPERATING. REDUCED VISIBILITY DUE TO SUSPENSED DUST |
TCP |
| LITRAN – ANGOSTURA – GENDARMERÍA – BATEA MAHUIDA |
DEFORMATIONS ON THE ROAD. |
TCP |
| ANGOSTURA / GENDARMERÍA – PASO ICALMA |
SECTORS WITH POTHOLES. EQUIPMENT OPERATING. CARRY CHAINS |
TCP |
| ICALMA STEP |
STEP ENABLED IN NORMAL HOURS |
TCP |
| ZAPALA (EMP. RN 22) – COVUNCO CENTRO |
ROAD WITH DEFORMATIONS. STRAY ANIMALS. |
TCP |
| COVUNCO CENTRO – EMP RN 40 (ACC. BAJADA DEL AGRIO) |
POCHED AND SAW SECTORS. |
TCP |
| THREE STONES – RAFT STEP OF THE INDIANS |
POCHED AND SAW SECTORS. |
TCP |
| EMP. RP 8 – YEAR |
INTENSE TRAFFIC. SECTORS WITH POTHOLES. |
TCP |
| Añelo – PLAZA HUINCUL |
INTENSE TRAFFIC. SECTORS WITH POTHOLES. |
TCP |
| PLAZA HUINCUL – PICÚN LEUFú (EMP. RN 237) |
SECTORS WITH POTHOLES. |
TCP |
| EMP. RP 23 – RUCA CHOROI |
ACCUMULATION OF WATER ON ROADWAY. CROSS SECTIONS. ROCK FALLS. |
TCP |
| EMP.RN 40 – CERRO CHAPELCO |
POCHED SECTORS. |
TCP |
| PICÚN LEUFú – LIMAY CENTRO – PASO AGUERRE – EMP. RN 40 |
POLED AND MUD SECTORS. STRAY ANIMALS |
TCP |
| EMP. RN 40 (AGUADA DEL OVERO) – SOUTH CHACAICO – EMP. RP 46 (FOX’S BACKBACK) |
POLED AND MUD SECTORS. |
TCP |
| EMP. RN 242 – HUARENCHENQUE – LONCOPUé |
|
T |
| LONCOPUé – EL HUECú |
POCHED AND SAW SECTORS. |
TCP |
| EL HUECÚ – MANDOLEGUE – EL CHOLAR |
POCHED SECTORS, HOURS, SAW. |
TCP |
| NEUQUÉN – ARROYITO |
INTENSE TRAFFIC |
TCP |
| ARROYITO – PLAZA HUINCUL – CUTRAL-Có |
INTENSE TRAFFIC. STRAY ANIMALS. EQUIPMENT OPERATING. |
TCP |
| CUTRAL-Có – ZAPALA |
STRAY ANIMALS. EQUIPMENT OPERATING. |
TCP |
| JUNÍN OF THE ANDES – MALLEO |
SECTORS WITH POTHOLES. STRAY ANIMALS |
TCP |
| MALLEO – PILO LIL |
SECTORS WITH POTHOLES. STRAY ANIMALS |
TCP |
| PILO LIL – RAHUE (EMP. RP 46) |
CUT WITH DEVIATIONS DUE TO PAVEMENT WORK. ROCK FALL. VERY POWERED SECTORS. |
TCP |
| RAHUE (EMP. RP 46) – ALUMINUM |
SECTORS WITH POTHOLES. EQUIPMENT AND PERSONNEL OPERATING, DETOURS, DELAYED OR OCCASIONALLY INTERRUPTED TRANSIT. |
TCP |
| ALUMINÉ – LITRAN (EMP. RP 13) |
EQUIPMENT OPERATING, VISIBILITY REDUCED DUE TO SUSPENDED DUST, LOOSE RIPPLE |
TCP |
| EMP. RP 13 (LITRAN) – HACHED PINE |
POWERED SECTORS, MUD. EQUIPMENT OPERATING. DEVIATIONS DUE TO CONSTRUCTION WORK |
TCP |
| EMP. RN 40 (CALCATRE) – LAS COLORADAS – FORTÍN 1º DE MAYO (EMP. RP 46) |
POLED AND MUD SECTORS. |
TCP |
| LONCOPUé – RISCOS BAYOS – HUALCUPéN |
STRAY ANIMALS |
TCP |
| HUALCUPÉN – BOY DRAWER – CAVIAHUE |
BREAK IN ASPHATLIC TAPE AND WATER FILTRATION. |
TCP |
| CAVIAHUE – COPAHUE |
PASSABLE WITH CAUTION, POWERED SECTORS. EQUIPMENT OPERATING. |
TCP |
| EMP. RP 33 – HUNCAL – RANQUILóN – EMP. RP 4 |
POWERED, SAW AND CROSS CUT SECTORS. |
TCP |
| LONCOPUé – HUNCAL (EMP. RP 10) |
POCEED, SAW AND HURELLONES SECTORS. |
TCP |
| EMP. RN 40 – QUINTUCO – EMP. RP 10 |
POCHED, HURELLONES AND SAW SECTORS. |
TCP |
| EMP. RP 2 – WAYLE |
POCHED SECTORS. |
TCP |
| WAYLE – LAGUNA TRóMEN – EMP. RP 53 |
POCHED SECTORS. |
TCP |
| ANDACOLLO – LOS MICHES |
POCHED SECTORS. |
TCP |
| ANDACOLLO – HUINGANCO |
POCHED SECTORS. |
TCP |
| CHOS MALAL – BARRANCAS |
AREA WITH LOOSE ANIMALS. EQUIPMENT OPERATING. |
TCP |
| LAS LAJAS (EMP. RN 242) – CHOS MALAL |
AREA WITH LOOSE ANIMALS. EQUIPMENT OPERATING |
TCP |
| ZAPALA – LAS LAJAS (EMP. RN 242) |
AREA WITH LOOSE ANIMALS. EQUIPMENT OPERATING. |
TCP |
| ZAPALA – LA RINCONADA (EMP. RN 234) |
POSSIBLE STONE FALL ON LA RINCONADA SLOPE. AREA WITH LOOSE ANIMALS. |
TCP |
| LA RINCONADA – JUNÍN DE LOS ANDES – SAN MARTÍN DE LOS ANDES |
AREA WITH LOOSE ANIMALS. POSSIBLE STONE FALL. EQUIPMENT OPERATING. |
TCP |
| SAN MARTIN DE LOS ANDES – ACC. CHAPELCO |
STRAY ANIMALS. EQUIPMENT OPERATING. |
TCP |
| ACC. CHAPELCO – LAGO VILLARINO |
STRAY ANIMALS. EQUIPMENT OPERATING. |
TCP |
| LAKE VILLARINO – EMP. RN 231 – VILLA LA ANGOSTURA |
STRAY ANIMALS. EQUIPMENT OPERATING. |
TCP |
| VILLA LA ANGOSTURA – EMP. RN 237 |
STRAY ANIMALS. EQUIPMENT OPERATING. |
TCP |
| EMP. RN 237 – PTE RÍO LIMAY (LTE C/RíO NEGRO) |
POSSIBLE STONE FALL AT KM 2,095. EQUIPMENT OPERATING. |
TCP |
| ACC QUILA QUINA (RN 40) |
POLED AND MUD SECTORS. EQUIPMENT OPERATING. |
TCP |
| ACC. BEAUTIFUL LAKE (RN 40) |
POLED AND MUD SECTORS. |
TCP |
| ACC. CAMPING CATRITRE (RN 40) |
POLED AND MUD SECTORS. |
TCP |
| EMP. RP 43 (CAEPE MALAL) – AQUIHUECO – CAJÓN DEL CURI LEUVÚ |
POLED AND MUD SECTORS. CROSS SECTIONS. CARRYING CHAINS. |
TCP |
| CHOS MALAL – LOS MENUCOS – SPRING |
ROUTE 43 AT THE HEIGHT OF CERRO DE LA VIRGEN, IMTRANSITABLE. DEVIATION BY THE CURí LEUVÚ RIVER, POCEED SECTORS. EQUIPMENT OPERATING IN RAPIDING AND SHIPING WORK IN THE DIVERSION AREA. |
TCP |
| THE SPRING – THE LLANO – ANDACOLLO |
DELAYED TRANSIT, REDUCED ROADWAY, PRESENCE OF PILGRIMS |
TCP |
| ANDACOLLO – CAYANTA – BELLA VISTA – LAS OHEJAS |
DELAYED TRANSIT, REDUCED ROADWAY AND PRESENCE OF PILGRIMS FOR THE FESTIVITY OF SAN SEBASTIAN |
TCP |
| THE SHEEP – VARVARCO – Aº AILINCO |
ONE HAND ENABLED DUE TO INCREASE AND SLIDING ROAD. POLED AND MUD SECTORS. REST IMTRANSITABLE THROUGH OVERGROWN STREAMS AND CUTS. ICE AND SNOW. |
TCP |
| EMP. RN 40 (10 KM FROM ZAPALA) – EMP. RP 24 |
SECTORS WITH POTHOLES, LOOSE ANIMALS. |
TCP |
| EMP. RP 24 – RAHUE (EMP. RP 23) |
POWERED SECTORS, LOOSE RIPPLE, REDUCED VISIBILITY DUE TO SUSPENSED DUST, EQUIPMENT OPERATING. |
TCP |
| RAHUE (EMP. RP 23) – LAGO QUILLéN – LAGO HUI HUI |
POWERED SECTORS, LOOSE RUBBLE, OPERATING EQUIPMENT |
TCP |
| SAN MARTIN DE LOS ANDES – HUA HUM STEP |
PATCHING EQUIPMENT OPERATING ON PAVED ROADWAY. POCHED SECTORS. |
TCP |
| ACC. BANDURRIAS (RP 48) |
POCHED SECTORS. |
TCP |
| ACC. CHACHIN – LAKE QUEEN (RP 48) |
POCHED SECTORS. |
TCP |
| PAS HUA HUM |
POWERED SECTORS |
TCP |
| EMP. RN 237 – EMP. RN 234 |
POLED AND MUD SECTORS. |
TCP |
| EMP. RP 7 – EMP. RP 8 |
INTENSE TRAFFIC |
TCP |
| EMP. RN 40 – EMP. RP 62 (COLOHUINCUL) |
POCHED SECTORS. EQUIPMENT OPERATING |
TCP |
| EMP. RP 23 – COVER PN LANÍN |
SECTORS WITH POTHOLES. |
TCP |
| COVER PN LANÍN – MAMUIL MALAL STEP (LTE WITH CHILE) |
POLED AND MUD SECTORS. |
TCP |
| MAMUIL MALAL PASS (EX TROMEN) |
EQUIPMENT OPERATING. MANDATORY CARRYING OF CHAINS. |
TCP |
| JUNÍN DE LOS ANDES (EMP. RN 40) – PTE CHIMEHUÍN RIVER – PAIMÚN LAKE |
POCHED SECTORS, LOOSE ANIMALS. |
TCP |
| SAN MARTÍN DE LOS ANDES (EMP. RN 40) – LOLOG AND CARRUHUÉ LAKE – LAHUENCÓ EPULAFQUEN – CARRIRRIÑE PASO |
SECTORS WITH POTHOLES AND WELLS. ROAD WITH DEFORMATIONS. EQUIPMENT OPERATING. LOLOG – CARRIRRIÑE STEP |
TCP |
| EMP. RN 40 – PTE RÍO MELIQUINA – PTE RíO FILO HUA HUM – PASO CÓRDOBA – CONFLUENCIA (EMP. RN 237) |
POCHED SECTORS. REDUCED VISIBILITY DUE TO SUSPENSED DUST, LOOSE ANIMALS. |
TCP |
| EMP. RP 63 – CALEUFú – LAKE FILO HUA HUM |
POCHED SECTORS. |
TCP |
| CONFLUENCE – VILLA TRAFUL – EL PORTEZUELO |
PAVEMENT WORK UNDER CONSTRUCTION IN SECTION JOINT RN40- VILLA TRAFUL. EQUIPMENT OPERATING, RESPECT THE SIGNS AND INDICATIONS. |
TCP |
| EMP. RN 40 – CERRO BAYO |
POCHED SECTORS. |
TCP |
| EMP. RN 40 (6 KM FROM VILLA LA ANGOSTURA) – PASO CARDENAL SAMORÉ |
SECTORS WITH LOOSE ANIMALS, EQUIPMENT OPERATING |
TCP |
| CARDINAL PASS SAMORÉ |
ENABLED. AREA WITH LOOSE ANIMALS. EQUIPMENT OPERATING |
TCP |
| LA RINCONADA (EMP. RN 40) – PTE COLLÓN CURÁ (EMP. RN 237) |
WET ROADWAY. AREA WITH LOOSE ANIMALS. EQUIPMENT OPERATING. |
TCP |
| EMP. RN 22 (ARROYITO) – EAGLE STONE |
NORMAL ROADWAY. AREA WITH LOOSE ANIMALS. EQUIPMENT OPERATING. |
TCP |
| EAGLE STONE – PTE COLLÓN CURÁ (EMP. RN 234) |
WET ROADWAY. AREA WITH LOOSE ANIMALS. EQUIPMENT OPERATING. |
TCP |
| PTE COLLÓN CURA (EMP. RN 234) – CONFLUENCIA (EMP. RP 63 AND 65) |
AREA WITH LOOSE ANIMALS. EQUIPMENT OPERATING. |
TCP |
| CONFLUENCE – EMP. RN 40 |
WET ROADWAY. AREA WITH LOOSE ANIMALS. OPERATING TEAM |
TCP |
| LAS LAJAS (EMP. RN 40) – EMP. RP 21 |
STRAY ANIMALS. |
TCP |
| EMP. RP 21 – EMP. RP 23 (500M AWAY FROM PINE HACHADO CUSTOMS) |
ICE FORMATION PROBABLE. |
TCP |
| EMP. RP 23 – HACHADO PINE STEP |
ICE FORMATION LIKELY |
TCP |
| HACHED PINE STEP |
ENABLED IN NORMAL HOURS. ICE FORMATION LIKELY |
TCP |