Up to 10 million euros in long-term debt could soon flow into rural mobile infrastructure across West Africa under a new financing framework announced on November 27.
NuRAN Wireless secured conditional investment committee approval from the AFRIGREEN debt impact fund for its operations in Côte d’Ivoire, stock.mk.co.kr reported. The prospective funding aims to back solar power and energy storage systems supplying rural telecom towers built for MTN Côte d’Ivoire.
The borrowing entity is NuRAN Wireless Côte d’Ivoire, a local subsidiary of the wireless group. The debt carries a maturity date of June 30, 2033, with formal loan agreement signing targeted for January 2027.
The facility offers a 24-month drawdown window with minimum tranches of 1 million euros. Interest is set at the Euro Interbank Offered Rate plus 6.50 percentage points, locked on the signing date. Principal repayments start after a 24-month grace period, governed by debt service coverage ratios.
Security for the debt includes a pledge over subsidiary shares, liens on equipment, bank accounts, insurance, and the assignment of MTN contracts and receivables. No equity-linked conditions, such as warrants or conversion rights, are attached to the approval.
“We are putting the debt on the subsidiary in Côte d’Ivoire, drawing only against sites accepted by MTN CI, and paying it back from those sites’ cash flows through 2033,” Jim Bailey, chief financial officer, explained to stock.mk.co.kr, according to Mk.
NuRAN holds contracts for over 5,000 sites across Africa, including up to 1,000 rural towers slated for MTN CI. Capital shortages have previously constrained deployment since network construction must be funded before generating revenue.
“It is the catalyst we have been waiting for,” Francis Létourneau, president, told stock.mk.co.kr. He added that the team must still complete extensive paperwork, finalize MTN negotiations, and secure equity financing.
“With this approval, we know exactly what the capital plan for Côte d’Ivoire looks like and what needs to be accomplished to make it happen,” Francis Létourneau, president, said.
“There is a lot of work to do, including paperwork, MTN CI consultations, and raising equity, and we have already started,” Francis Létourneau, president, added.
The approval remains non-binding, with conditions requiring prior equity investment for each drawdown and formal settlement of environmental, land, and local regulatory matters.
The investors include European and international development financial institutions.