Seville Begins €265,120.44 Renovation of San Diego Gardens: New Paths, Green Areas, Recycled Furniture

Work on the San Diego Gardens in Seville began this week, as the City Council launched a 265,120.44 euro renovation project to upgrade paths, landscaping, and public furniture, according to Collector.

  • Crews started with the southern section of the gardens, demolishing and leveling lateral pathways.
  • The project includes installing 377 square meters of new planting beds and replacing 27 benches and 12 trash bins.
  • The city has allocated 5,646.49 euros to repaint the iron fencing surrounding the entire site.

Andalunet Sevilla reported that the Seville City Council started demolition of the southern lateral pathways on November 23, 2026, according to Agenda de ocio, cultura, deportes y turismo en Sevilla. Crews are leveling and compacting the ground before adding new albero to restore proper grades.

According to collector.com.tr, the project includes installing conduit pipes along both lateral and central pathways to enable a future irrigation system connection.

The Seville City Council, led by José Luis Sanz since his investiture as mayor in June 2023, launched the 265,120.44 euro renovation of San Diego Gardens this week, according to Collector. Sanz, a member of the People’s Party (PP), previously served as mayor of Tomares from 2007 to 2021 and as a senator for Seville from 2011 to 2023.

The initial phase involves removing damaged concrete and cobblestones from access points and lateral paths, which will be filled with new albero, according to [Andalunet Sevilla]. In the central areas, the ground is being prepared for the installation of stamped concrete paving.

Beyond the pathways, the project targets the park’s vegetation. Workers are cleaning and adding mulch to approximately 4,600 square meters of existing planting beds. The plan also adds 377 square meters of new garden space, split between 215 square meters of natural meadow and two grass plots of 81 square meters each, [abc.es] reported.

The city government, led by José Luis Sanz, has also included infrastructure for future utility upgrades, such as installing conduit pipes for an irrigation system.

The furniture replacement, which cost 34,429.93 euros including taxes, features items made from recycled materials, [collector.com.tr] noted.

“These improvement works will allow us to recover and improve a green space so that neighbors can enjoy it in better conditions,” said Evelia Rincón, the delegate for Parks and Gardens, in a statement reported by abc.es.

Rincón added, “Having cared-for, accessible parks and gardens prepared for daily use contributes to improving the quality of life and offers citizens places to walk, rest, and engage in outdoor physical activity.”

As construction continues, the city advises visitors to follow onsite signage, as certain zones in the southern area may face temporary closures. Residents are encouraged to use only the paths that remain open while the renovations are underway.

Photo of author

World Desk

World Desk at Archyde.

AMD Is Expanding Its AI Hardware Portfolio by Acquiring the Canadian Startup Taalas