The U.S. Air Force is hunting for suppliers of 256-megabyte PC Cards and CompactFlash media to keep the F-22 Raptor’s mission-data cartridges flying, a procurement notice posted Nov, according to Kompas.
16 shows. Responses are due by 1 p.m. EST on Dec. 1, according to the Air Force Life Cycle Management Center.
The notice, published on SAM.gov under ID FA8611-27-R-F-22, seeks vendors able to provide ATA flash cards in the Personal Computer Standard 95 Type II form factor — known as PC Cards — and CompactFlash cards mated to a passive CompactFlash-to-PCMCIA Type II adapter, according to LavX News.
Each card must hold at least 256 megabytes and be readable and writable on the government-furnished host system used by the F-22’s micro Data Transfer Cartridge. The Department of Defense, Department of the Air Force, and Air Force Materiel Command sit above the issuing office, FA8611 AFLCMC WAUK F22, at Wright-Patterson Air Force Base, Ohio.
The cartridge moves mission data from ground computers into the jet before takeoff. Technicians load flight routes, radio settings and threat information onto the cartridge; the pilot inserts it into the cockpit system prior to launch. After the sortie, the cartridge is removed so maintainers can review the recorded flight data.

The requirement bridges two hardware generations. PCMCIA Type II and CompactFlash interfaces date to the late 1990s and early 2000s, while the F-22 entered service in 2005 and remains in the fleet. The stipulation that cards work on the existing host system signals the Air Force intends to maintain compatibility with the aircraft’s current avionics rather than replace the host hardware wholesale.
The F-22 first flew in September 1997, so portions of its electronics still rely on standards developed in that decade. Although the last aircraft was delivered in 2012, much of the onboard hardware still requires components compatible with the original design.
The notice is a sources-sought synopsis, not a solicitation for offers or a contract award. The Air Force uses it to determine whether industry can meet the need before deciding how to proceed with procurement, and it provides no guarantee of a follow-on contract. The opportunity expires Dec. 16, 15 days after the response deadline. The notice carries NAICS code 336411, Aircraft Manufacturing.
Interested companies must be based in the United States and are asked to detail their counterfeit-prevention procedures, estimated production lifespan, planned end-of-production date and last-time-buy availability. The primary point of contact is Rafael Manzano at [email protected]; the alternate is Tamera Moore at [email protected]. The contracting office phone is (937) 656-5842, and its address is 2725 C St., Bldg. 553, Wright-Patterson AFB, OH 45433-7424.
Wright-Patterson Air Force Base sits just east of Dayton, Ohio, across Greene and Montgomery counties. The site traces its aviation roots to 1904–1905, when Wilbur and Orville Wright conducted experimental test flights with the Wright Flyer III on Huffman Prairie.
Formalized as Wilbur Wright Field and McCook Field during World War I, the two fields merged into Wright-Patterson AFB in 1948. The base later hosted the 1995 Dayton Agreement negotiations that ended the Bosnian War.
The Air Force has not disclosed how many cards it needs or what budget has been set aside. A single attachment, “F-22 mDTC SSN (RM).pdf,” is available on SAM.gov.