Upcoming Major Roadworks on E411: Traffic Updates and Lane Diversions in October

2023-09-20 10:11:52

Traffic will become more complicated along the E411 in the coming weeks. A motorway surface repair project will be set up between Nil-Saint-Vincent and Louvrange during the month of October.

The project aims to rehabilitate the upper layers of the surfaces of the emergency and right-hand stopping lanes over a portion of eight kilometers, only in the direction of Brussels.

The site will be gradually installed between September 25 and October 2. From October 2 until the end of the month, the speed will be reduced to 70 km/h in both directions.

In practice

Towards Namur, three lanes will be maintained but diverted (using the emergency lane). Towards Brussels, during morning rush hours, from 6 a.m. to 9 a.m., three lanes will be maintained. Outside of this time, two routes will be accessible. Motorway accesses and exits n°8a (Louvain-la-Neuve) and n°9 (Corroy-le-Grand) will be closed for two days to proceed with the paving of the ramps. The dates of these closures will be specified later depending on the progress of the construction site and weather conditions.

1695209419
#disruptions #E411 #Brussels

Photo of author

Alexandra Hartman Editor-in-Chief

Editor-in-Chief Prize-winning journalist with over 20 years of international news experience. Alexandra leads the editorial team, ensuring every story meets the highest standards of accuracy and journalistic integrity.

Gabon Coup: Indictments, Imprisonment, and Corruption Scandal Surrounding Ali Bongo’s Clan

Retail protests and says that Shein cannot pay ICMS instead of the consumer on imports

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.