Vaud Court Annulled Permit for 20 Housing Units in Moudon’s Historic Centre

A Vaud court has annulled a building permit for 20 housing units in Moudon’s historic centre, blocking construction until the design respects protected heritage walls and roof regulations.

The Vaud Cantonal Court ruled in favor of Patrimoine suisse and seven neighboring property owners who opposed the project on Chemin du Montillier, 24 Heures reported. The site lies within Moudon’s historic centre, which is listed in the Federal Inventory of Swiss Heritage Sites of National Importance (ISOS).

The dispute centered on the building’s top level. The Court of Administrative and Public Law determined the planned attic space did not qualify as a genuine attic. On the building’s eastern side, the knee wall would exceed two meters in height, well beyond the one-meter limit established by case law. Combined with asymmetrical roof slopes, this created the effect of an additional, unauthorized floor under municipal regulations, the court found.

The Directorate General for Real Estate and Heritage (DGIP) had issued a favorable pre-approval but with reservations on architectural integration. In its final determination, the cantonal service recommended setting the building back from the street and reducing its height to preserve the protected ancient walls and enhance the existing Note 3 listed building. The tribunal followed this analysis, concluding the project failed to comply with provisions protecting the old walls.

While the court acknowledged that the volumetric possibilities of the 2018 “Centre” partial allocation plan had been validated with ISOS considerations, it stressed that concrete execution must respect integration rules.

The developer must revise the project to obtain a new permit.

The 24 Heures newsletter “L’actualité en bref, le matin” and “L’actualité en bref, le soir” have reported that other construction permits have also been cancelled. Each morning, the newsletter features the essential of interviews, reports, and investigations, carefully selected by the editorial team. Each evening, it offers a selection of the day’s news from the canton, Switzerland, and the world. The parcel concerned is shown in yellow on the Cadastre Vaud map and is located on chemin du Montillier in Moudon. A construction project for 20 housing units on this site was stopped by the Vaud justice system. The Vaud Cantonal Court cancelled the building permit issued by the Municipality, siding with Patrimoine suisse and seven neighboring property owners who opposed the project located in the historic centre of this small town, which is listed in the Federal Inventory of Swiss Heritage Sites of National Importance to be protected (ISOS). The dispute notably concerned the qualification of the top level of the proposed building. The Administrative and Public Law Court estimated that the space planned under the roof did not constitute genuine attics. On the east side of the building, the knee wall would exceed 2 meters in height, well beyond the legal precedent limit of 1 meter. A building permit is still possible. The developer will have to revise the project to obtain a new permit.