Vinnytsia Officials Cite Limits, No 2026 Funds for Kindergarten No. 31 Shelter

Parents must wait for a kindergarten shelter as Vinnytsia officials cite technical limits and missing funds for the project.

Children attending kindergarten No. 31 on Radiona Skaletskoho Street currently use a basic shelter holding only 50 people, suspilne.media reported, according to Suspilne. Structural features make it technically impossible to expand the existing space.

Valentyna Horobets registered a petition to the mayor and the Vinnytsia City Council on November 6, 2026. Families asked for a safe shelter near the facility because children must walk about 450 to 500 meters during air raid alerts to reach Vinnytsia Lyceum No. 16 on Matrosa Kishky Street.

“The petition regarding the arrangement of a protective shelter in one of the new municipal buildings near the kindergarten requires prior determination of the technical possibility of using the corresponding room as a civil protection structure, assessment of its capacity and compliance with established requirements. In addition, to obtain permission to use the premises, the written consent of all residents of the building is required,” the executive committee of the Vinnytsia City Council stated.

Alternative Options Under Review

The municipal budget for 2026 allocates no funds for building, reconstructing, or expanding a shelter at kindergarten No. 31. Instead, the city is reviewing other proposals.

The capital construction department is adjusting design and estimate documentation for capital repairs at the lyceum shelter on Matrosa Kishky Street to accommodate more people, including kindergarten pupils. Meanwhile, the education department inspected the walking route to map out a shorter and safer path that reduces the time children spend outdoors.

Officials also submitted a proposal to build a radiation-resistant shelter directly on the kindergarten grounds for the 2027–2029 medium-term public investment plan. This idea still needs a feasibility study, cost estimates, and funding sources before it can move forward.

Photo of author

Newsroom

Newsroom at Archyde.

From Prompt Engineer to Clinical AI Engineer: How One Doctor is Integrating AI at Boston Children’s Hospital