Traffic Alert: I-684 Bridge Work and Lane Reduction – Plan Your Weekend Travel in North Salem, NY

2023-10-21 00:29:00

Bridge work is expected to take place between 8 a.m. and 2 p.m. on Saturday, affecting the southbound lanes.

Oct 20, 2023 8:29 pm EDT | Updated Oct 20, 2023 8:33 pm EDT

NORTH SALEM, NY — If you’re planning to take advantage of a break in the rainy weather to do a little apple picking and check out the fall colors, maybe consider taking the scenic way home.

A lane reduction along I-684 in North Salem is planned on Saturday for bridge repairs.

The New York State Department of Transportation said that Interstate 684 southbound will be reduced to one lane between Exit 6 (State Route 35) and Exit 4 (State Route 172) in North Salem.

Subscribe

The bridge repairs are expected to take place between 8 a.m. and 2 p.m., weather permitting.

The NYSDOT is reminding drivers to slow down and drive responsibly in work zones. Remember, fines are doubled for speeding in a work zone. Convictions of two or more speeding violations in a work zone could result in the suspension of your driver’s license.

For up-to-date travel information, call 511, visit www.511NY.org or download the free 511NY mobile app.

1697849623
#Traffic #Alert #Weekend #I684 #Lane #Reduction #North #Salem

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.