Quang Ninh put into use Ao Tien cruise ship port from February 28 | Traffic

Ao Tien luxury wharf. (Source: Quang Ninh Newspaper)

District People’s Committee Van Don (Quang Ninh) is urging the implementation of moving passenger waterway vehicles from Cai Rong general port sang Ao Tien luxury cruise ship port to serve the transportation of passengers to the island routes.

According to the plan, the review of waterway passenger transport means that must be moved will be completed before February 12; The construction of the relocation plan was completed before February 20 and the relocation was completed before February 28.

After moving passenger water transport to Ao Tien high-class ship port, Cai Rong port became a specialized ship port, serving fishing vehicles.

[Phê duyệt Quy hoạch tỉnh Quảng Ninh thời kỳ 2021-2030, tầm nhìn 2050]

Mr. Le Van Tong, Director of Ka Long Transport Company Limited, the unit assigned to manage and operate Cai Rong port, said that the move of passenger ships by waterway to Ao Tien port follows the policy of of the province Quang Ninh is suitable, beneficial for residents and visitors. Because Ao Tien port is a high-class cruise ship port, people and tourists can use more modern and civilized services than the old port.

Ao Tien high-class port, invested by Mai Quyen Company Limited, was started in April 2022 and inaugurated and put the port into operation in October 2022. The project has a total investment of more than 610 billion VND.

This is a specialized passenger port serving tourist transport on the Van Don route (Van Don district to the islands) and attractions on Bai Tu Long Bay, Ha Long Bay.

The port is invested and built in Ha Long commune, Van Don district, with a scale of nearly 30 hectares, synchronous, modern, integrated with many utilities, designed according to the theme of green space; in which, the land area is 5.9ha, the rest is water surface.

The project is designed with 5 wharves, 2 berths of 20m wide and 150m long that can accommodate fishing vessels up to 300 seats and 3 auxiliary berths for yachts and small ships. The lock zone can receive 150 cruise ships at the same time.

The passenger terminal area has a usable area of ​​8,000m2, designed capacity of 2.6 million passengers/year in the period 2020-2025 and expands to 3.2 million passengers/year, period 2025-2030; integrated with many utilities, functional subdivisions such as passenger pickup, ticketing, waiting room, accompanying ancillary services…

Putting Ao Tien high-class port into operation will open a new, synchronous and modern gateway for Van Don center to connect with island communes and Co To district.

The port is not only a new tourist service infrastructure but also a meeting place for super yachts in each journey through Van Don in particular and the Eastern region of the province in general, meeting the goal of improving quality. provincial services.

The People’s Committee of Van Don district requested the relevant units and businesses to arrange the location at Ao Tien port appropriately, with priority on the basis of the advantages of the vehicles from the arranged position at the port. old, avoid causing petitions and conflicts of vehicle owners.

At the same time, ensure a convenient location for all moving vehicles and arrangement for new vehicles arising during the port operation; ensure the parking area, environmental sanitation, landscape of the port…

The investor of Ao Tien high-class port, Mai Quyen Company Limited, must notify the port’s operation route, support regimes and policies as well as regulations on management and leasing of parking spaces. , parking of vehicles registered to transport passengers at the port./.

Van Duc (VNA/Vietnam+)

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.