Upcoming Replacement of Damaged Traffic Bridge with Improved Accessibility in Western Ring: Updates and Recommendations

2023-09-23 06:20:00

The Flemish traffic agency (Agentschap Wegen en Verkeer) recommends that motorists avoid the western part of the ring or pass through Tervuren and Waterloo.

A truck loaded with paper hit the underside of the bridge in August 2019. The vehicle caught fire and damaged one of the bridge’s steel beams. Since the accident, the structure has been closed to traffic.

The Agentschap Wegen en Verkeer is working on replacing the bridge, which will have two lanes for pedestrians and cyclists, each 2.5 meters wide. A 3 meter wide lane for cars is planned in the middle of the road, motorists will have to cross the bridge in turns.

The bridge should normally be put into service in the summer of 2024.

1695456132
#Disturbances #sight #Brussels #ring #road #weekend

Photo of author

Alexandra Hartman Editor-in-Chief

Editor-in-Chief Prize-winning journalist with over 20 years of international news experience. Alexandra leads the editorial team, ensuring every story meets the highest standards of accuracy and journalistic integrity.

Nicholas Sean and Vietyana Chloe: A Controversial Love Story that Defies Marriage Norms

concert #72: dlina volny, annika henderson, zola jesus @ desertshore festival in the folk theater | 12/03/2022

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.